Projects

integrated transport terminal – bandar tasik selatan

INTEGRATED TRANSPORT TERMINAL – BANDAR TASIK SELATAN

Client :
Malaysian Government
Type of Service :
Transportation

This project is Kuala Lumpur’s main transportation hub, diverting all bus traffic from the city centre to outside of the city. Covering a development area of approximately 49 acres, the TBS-BTS Terminal Building complex has 6 floors, 55 bus platforms,150 taxi bays,1000 parking bays (with special parking bays for women) and 1800 seats for the public within its fully air-conditioned waiting halls.

Share This:


matriculation college, banting, selangor darul ehsan

MATRICULATION COLLEGE, BANTING, SELANGOR DARUL EHSAN

Client :
Ministry Of Education
Type of Service :
Education
Construction Period :
31 January 2008 – 30 January 2010

Share This:


klang marina, selangor

KLANG MARINA, SELANGOR

Client :
Marine Department, Malaysia
Type of Service :
Design and Build (Geotechnical, Civil and Structural Engineering Services)
Construction Period :
April 2006 – 31 January 2008
Duration :
24 Months

The Klang Marina at Pulau Indah is one of the proposed marina complexes to be developed for the Malaysian Marine Department. This development consists of 150 berths, one clubhouse and ancillary facilities.

Share This:


maju expressway

MAJU EXPRESSWAY

Type of Service :
Construction and Engineering Management and Maintenance Service
Commencement Date :
December 2004
Duration :
26 Months

MESB has completed the construction of the highway from Kuala Lumpur to Cyberjaya and Putrajaya,a distance of 26 kilometres, 10 kilometres of which is elevated. This highway provides a strategic and direct linkage between the Kuala Lumpur City Center and Putrajaya, en-route to Kuala Lumpur International Airport (KLIA).

Share This:


refurbishment of loader and unloader crane

REFURBISHMENT OF LOADER AND UNLOADER CRANE

Client :
Perwaja Steel Bhd
Type of Service :
Project Management, Civil and Structural Engineering Services
Commencement Date :
May 2004

This project involved the refurbishment of loader and unloader cranes at Kemaman for Perwaja Steel Sdn Bhd. Our Engineering teams provided advice on the method of refurbishment on the main and secondary structures of the cranes as well as supervision works.

Share This:


direct reduced iron – perwaja plant extension

DIRECT REDUCED IRON – PERWAJA PLANT EXTENSION

Client :
Perwaja Steel Bhd
Type of Service :
Project Management, Civil and Structural Engineering Services
Commencement Date :
March 2004

This project was to upgrade the existing system for screening and coating of iron ore.

Share This:


harbour park langkawi

HARBOUR PARK LANGKAWI

Client :
Langkawi Development Authority (LADA)
Type of Service :
Construction
Construction Period :
March 2004
Duration :
10 months

Harbour Park Langkawi at Pantai Kok is a Mediterranean-themed harbour town, developed to cater for sailboats and mega yachts. There is a fully equipped marina comprising 51 berths that can accommodate a variety of vessels of up to 20 meters. As part of the berthing facility, there is also a 36 metre pontoon to cater for fishing boats.

Share This:


muar marina, johor

MUAR MARINA, JOHOR

Client :
Marine Department, Malaysia
Type of Service :
Design and Build (Geotechnical, Civil and Structural Engineering Services)
Construction Period :
18 Months
Commencement Date :
November 2003

Construction of the marina placed emphasis and maintaining a consistent water depth in view of the fluctuating water levels of the Muar river. The project includes land filling to reclaim 3 acres of land, coastline protection, floating pontoons, boat ramp for dry berthing facilities, hydrology modelling and analysis and provisions for soil stability.

Share This:


royal malaysian customs complex

ROYAL MALAYSIAN CUSTOMS COMPLEX

Client :
Royal Customs and Excise Department of Malaysia
Type of Service :
Design and Build (Civil and Structural Engineering Services)
Commencement Date :
January 2003
Duration :
20 Months

The complex comprises several components including office blocks, apartments, a car park, a multi-purpose hall, a surau and other ancillary buildings. The 6 storey office blocks and four blocks of apartments were constructed using structural steel frames with a composite flooring system. The low rise residential block, office block, multi-purpose hall and surau were constructed using reinforced concrete structures.

Share This:


sungai besi – jalan istana steel bridge

SUNGAI BESI – JALAN ISTANA STEEL BRIDGE

Client :
Kuala Lumpur City Hall
Type of Service :
Design and Build (Geotechnical, Civil and Structural Engineering Services)
Commencement Date :
December 2000
Duration :
4 Months

To facilitate free flow of traffic from Besraya Highway/Jalan Sungai Besi to Jalan Istana, passing over the Kuala Lumpur – Seremban Highway.

Share This:


slip road from jalan sungai besi – kuala lumpur – seremban highway

SLIP ROAD FROM JALAN SUNGAI BESI – KUALA LUMPUR – SEREMBAN HIGHWAY

Client :
Kuala Lumpur City Hall
Type of Service :
Design and Build (Geotechnical, Civil and Structural Engineering Services)
Construction Period :
September 2000
Duration :
45 Days

The overall development involves building a slip road and widening the existing bridge. The project has considerably eased traffic congestion in the area.

Share This:


maju tower

MAJU TOWER

Client :
ASM Properties Sdn Bhd
Type of Service :
Design and Build ( Civil and Structural Engineering Services )
Commencement Date :
December 1999
Duration :
24 Months

Maju Tower comprises two office towers and a 5 level shopping mall. The construction of the basement, podium and the 33 storey office tower utilized reinforced concrete frames. The 43 storey tower was constructed using structural steel frames with a steel composite flooring system.

Share This:


kampung tok senik resort, langkawi

KAMPUNG TOK SENIK RESORT, LANGKAWI

Client :
Maju Hotels and Resort Sdn Bhd
Type of Service :
Construction
Commencement Date :
May 1996
Duration :
24 Months

Located on the mythical and scenic island of Langkawi, Kampung Tok Senik Resort offers a unique blend of traditional and modern amenities. Accommodation takes the form of rustic Malay village homes set in a placid environment dominated by paddy fields, rubber trees and tropical greenery. Speciality suites are fashioned after homes of traditional Malay tradesmen.

Share This:


desa utara pedu lake resort, kedah

DESA UTARA PEDU LAKE RESORT, KEDAH

Client :
Maju Hotels and Resort Sdn Bhd
Type of Service :
Construction
Commencement Date :
April 1995
Duration :
4 Months

Desa Utara Pedu Lake Resort consists of chalets styled after traditional Malay village homes. It was built on a 300-acres expanse of tropical rainforest dominated by a large freshwater lake. The resort also offers a full of range facilities designed to meet the demands of business meetings, team-building and outward-bound courses.

Share This: